The full bathroom was totally remodeled. The tub was replaced with a neo angle shower in a new location. The hanging sink was replaced with a pedestal sink. The old metal window was replaced with an energy efficient window. New marble floor was installed. The ceiling was raised and a chair rail was installed on the walls.
Original bathroom
New bathroom - mirror above sink and cabinet above the toilet will be installed once they arrive.
Nice to read this publication on this blog. As far as I can see, this is a very basic question for everyone indeed. Its my personal opinion and I am completely agreed with the subject used here. Local contractor
ReplyDelete