Saturday, September 24, 2011

Baseement Wall Repair



Wall was damaged from water infiltration from exterior wall. Damaged area was removed and new wire mesh re-inforced cement finish was installed and painted. Electrical switch re-installed on wall.



Two "bricked in" coal chutes. Coal chutes were bricked in and backfilled with concrete to keep water from coming into the basement.


Third coal chute being filled in with bricks and concrete.

Tuesday, March 29, 2011

Door knobs - 1800s - early 1900s

The current door knobs consist of mostly round glass knobs with a silver circular disk embedded in the middle of the glass. There are a few knobs that do not match. We are going to see if we can locate matching knobs and rosettes. One of the doors removed has a pair of the needed knobs so we only need approximately 3 more knobs. If anyone knows where we may find additional knobs we are open to suggestions.

Antique Silver Mercury Glass Door Kob - These are very rare. I have been searching on line for 2.5 hrs. with no luck. Will try Restoration Resources later this week.



Door with missing knob - will try to locate replacement.

Pocket door (right side) to Arch Bishop's office. Will try to locate a key to allow the pocket doors to lock.

Pocket door - left side.

Hall/Stairway Wall Prep -2

Second floor hall


Front stairway from first floor to second floor

Second floor hall

Hall/Stairway Wall Prep

First floor rear hall

Back stairway from second floor to third floor

Third floor hallway

Third floor hallway at rear

Front stairway from third floor to second floor

Sunday, March 27, 2011

Kitchen - New Framing



Kitchen walls had no 2x4 framing, only 1x3 strapping attached to the bricks. Strapping was removed. Bricks were re-mortared. New 2x4 wall framing installed. New insulation will be installed.

Full Bathroom - framing



Full bathroom 2x4 framing. Bath window will need to be replaced, single pane and has some old cracks that were sealed previously with silicone.

Front Room Re-Framing



Walls had no 2x4 framing, only 1x3 strapping attached to the brick walls. Strapping was removed and new 2x4 framing installed in front room. New insulation will be installed. The brick mortar joints need to be repaired due to cracks, missing mortar and missing bricks.